One of the greatest workplace frustrations is having an overnight-prepared PPT impatiently interrupted by the boss moments after starting. This "effort without recognition" dilemma stems not from valueless work, but from a misalignment between your linear narrative and senior management's decision-making logic. In a fast-paced business environment, bosses with limited cognitive bandwidth urgently need clear conclusions to aid judgment, not lengthy backgrounds or detailed lists. To fundamentally resolve this, the "Pyramid Principle" from McKinsey is a core skill workplace elites must master. Its core lies in breaking the habit of rambling and strictly following the "conclusion first" rule: state the core point immediately, then build a rigorous support system using top-down governance, grouping, and logical progression. This structured approach reduces the audience's cognitive load, enabling quick information grasp while demonstrating your business control and logical thinking. True experts transform complex bottom-up thinking into clear top-down expression, driving decisions with results rather than trying to impress superiors with effort. Mastering this model allows you to transform project updates or bad news into clear decision-making bases, reshaping your communication efficiency and professional image.
Why Does Your Boss Always Interrupt You? — Often It’s Not Because of "No Time," But "No Key Point"
You must be familiar with this scenario: in order to report on a project to upper management, you work overtime for several nights preparing a thick stack of PPTs. Your thinking is honest—from the preliminary background of the project and the difficulties encountered in the middle, to how the team overcame challenges, every detail embodies your effort. You feel you must explain the "ins and outs" clearly to reflect the value of the work.
However, five minutes into the meeting, just as you are reaching the third page of "Background Analysis," the boss suddenly looks up and interrupts: "Wait a minute, give me the conclusion first. Is this feasible? Where are the risks?"
At that moment, you might feel aggrieved or even angry: feeling that the boss has no patience, disrespects your professionalism, and only looks at results rather than the process. But in fact, the pain of "being interrupted" often stems from a misalignment of communication channels.
Cognitive Misalignment: Your "Narrative Logic" vs. The Boss's "Decision Logic"
The natural human habit of expression is "Narrative Mode," which unfolds according to chronological order or causality: laying the background first, describing the process, and finally revealing the ending. This method is suitable for storytelling, but it is fatally inefficient in workplace reporting.
For managers, they operate from a completely different decision-making perspective. The time granularity of frontline executors is often calculated by "days" or "project nodes," while the time granularity of executives is calculated by "minutes." They simultaneously pay attention to multiple dimensions such as funds, progress, and risks, and their brains are in a state of high-load operation. When you are laying out a long background, their Cognitive Bandwidth is being rapidly consumed by invalid information, and anxiety rises accordingly—it's not that they don't want to listen, but if they don't interrupt you, they cannot capture the key information needed to make a decision within the limited time window.
Practical Comparison: Why Doesn't "Hard Work" Impress the Boss?
Let's look at how this difference in thinking leads to communication collapse or success through a comparison of a real "Bad Example" and "Good Example."
❌ Bad Example: Linear Narrative (Focusing on Process and Effort)
Employee: "Boss, regarding the handling of that customer complaint, it's like this. Last Wednesday, the customer sent an email saying the system couldn't be logged into. We checked the logs at the time and thought it was a network fluctuation. Later, on Thursday, he called again, very emotional, so I hurriedly contacted Old Wang from the Technical Department. Old Wang was busy with another project at the time, so I waited for him for half a day. Finally, we troubleshot together and found it was a compatibility bug in the underlying code. This bug is very rare, and we fixed it all night..."
Boss (Inner Monologue): So? Is it fixed? Is the customer satisfied? Will it happen again? Do I need to intervene?
Boss (Interrupting): "Just tell me, is the problem solved now?"
✅ Good Example: Conclusion First (Focusing on Results and Next Steps)
Employee: "Boss, regarding the issue of the customer complaining about the system login failure, it has been completely resolved, and the customer is satisfied.
The cause was a rare compatibility bug, which we fixed and launched last night. To prevent recurrence, we suggest conducting a comprehensive review of similar modules next week, requiring your approval for half a day of technical resource allocation."
In this version, the employee gives the reassurance the boss cares about most (resolved, satisfied) right at the opening, and then quickly provides the reason and the support needed (review, resources). This communication style not only saves time but also demonstrates your control over the situation.
Remember, the boss interrupting you is usually not because they have a bad temper, but because your report lacks structure. They are trying to use questions to forcibly help you "summarize" the key points from the scattered information. In that case, why not directly give them this "key point" from the start? This is exactly the core problem that the McKinsey "Pyramid Principle" aims to solve.
What is the Pyramid Principle? — The Core is "Conclusion First"

The Pyramid Principle is a structured thinking and communication technique proposed by McKinsey consultant Barbara Minto. Its core definition is very simple: In communication, anything can be summarized into a central argument, supported by three to seven arguments; state the conclusion first, then the basis.
This "top-down" mode of expression can greatly reduce the cognitive burden on the audience. To ensure the effectiveness of communication, the Pyramid Principle must follow the following four core principles:
- Conclusion First
This is the most critical step. Every article or report can have only one central idea, and it must be expressed at the very beginning. This allows the boss or audience to grasp your core intention immediately, avoiding doubts or guesses while listening to details. - Above Governs Below
Upper-level ideas must be a summary and generalization of lower-level ideas. Every one of your arguments (upper level) must be strictly supported by facts or data from the next level down, forming a tight logical loop to ensure that after hearing the conclusion, managers can quickly find the corresponding basis in the lower levels. - Grouping
Ideas in each group must belong to the same logical category. Classifying messy information according to its nature (e.g., market, technology, finance) aligns with the brain's "chunking" habit of processing information, making complex information organized and easy to remember. - Logical Ordering
Ideas in each group must be arranged in a logical order. Whether following chronological order, structural order, or order of importance (degree), an orderly presentation can guide the audience to transition smoothly along your train of thought, avoiding comprehension barriers caused by jumping thinking.
Practical Breakdown: How to Turn a "Running Account" into a "Structured Report"?

For many people trying to apply the "Pyramid Principle," the most painful moment often occurs the second they open a blank document. You know in your heart that you should put the "conclusion first," but looking at the disorganized data, chat logs, and project schedules at hand, you find that you simply cannot find that conclusion.
This sense of frustration is completely normal because efficient communication involves a core paradox: the order of expression is often the opposite of the order of thinking.
When delivering the final report (Output), you need to present a perfect pyramid structure: the apex is the conclusion, and below are the supporting arguments. But during the thinking phase of preparing the report (Input), you must do the opposite—adopt a Bottom-Up path. As emphasized by the construction method of the Pyramid Principle, you cannot fabricate a conclusion out of thin air; instead, you must first collect the bottom "bricks" (facts and data), and through induction and reasoning, finally stack them into the viewpoint at the apex.
This is just like panning for gold:
- The thinking process (Input): It is a "funnel model." You pour in a large amount of mud and sand (raw information), pass it through layers of screening (grouping and categorizing), and finally, through refinement at the bottom of the funnel, obtain a few grains of gold (core conclusions).
- The reporting process (Output): It is a "pyramid model." You directly display those few grains of gold (conclusions) in the most prominent position for your boss, and then explain how you filtered them as needed.
The reason many workplace newcomers write "running accounts" is that they directly transfer the "gold panning process"—that is, the entire process of their hard work—intact into the report. The boss doesn't care how many tons of mud and sand you dug up; he only wants to see the gold.
To turn a running account into a structured report, you don't need to be a born logic master; you just need to reverse your workflow: first think bottom-up like an analyst, then express top-down like a CEO. Next, we will break down the specific steps of this "reverse engineering."
Step 1: Addition First (Collection and Organization), Then Subtraction (Summarizing Conclusions)

Many people mistakenly believe that "conclusion first" means forcing out a viewpoint before opening their mouths, which often results in emptiness due to a lack of support. In reality, the true Pyramid Principle is "top-down" when expressing (conclusion first, then details), but must be "bottom-up" when thinking (details first, then conclusion).
If you don't first sort out the underlying complex information, you cannot reach a powerful conclusion. This process can be broken down into a four-step cycle of "addition first, then subtraction."
1. Collect and List (Addition): Exhaust the Facts
Do not try to organize logic right from the start; list all relevant information points (Facts) first. The goal of this step is "completeness," not "refinement." You can write all the data at hand, observed phenomena, and feedback received on paper or a whiteboard.
2. Classify and Group (Organization): Find Commonality
Look at the scattered information points and find the logical relationships between them. Merge content with similar attributes into groups. According to the core principles of the Pyramid Principle, common classification logics include:
- By Business Module: Marketing, Technology, Operations.
- By Nature: Positive news, negative news.
- By Cause and Effect: External environment, internal execution, result data.
3. Distill Viewpoints (Subtraction): Ask "So What?"
This is the most critical step and the reason why most reports fail—only classification was done, not distillation.
Ask yourself regarding each group of data: "What does this information imply?" (So What?).
- Incorrect Distillation: "Report on sales data" (This is just a title, not a viewpoint).
- Correct Distillation: "Sales volume has declined continuously, mainly impacted by the low-price strategy of competing products."
4. Summarize Core Conclusion (Synthesis): Set the Tone in One Sentence
Synthesize the sub-arguments derived in Step 3 again to reach a core conclusion (Core Message) that governs the whole picture. This conclusion is the first sentence you should say at the beginning of the report.
---
Practical Exercise: The Project Manager's "Bad News" Report
Assume you are a project manager; the project launch is imminent, but you have a mess on your hands. If you report directly, it can easily turn into incoherent complaining. Let's try to apply the four-step method mentioned above:
Step 1: List Facts (Disorganized)
1. The testing team just found a payment interface Bug.
2. Fixing this Bug takes at least 3 days.
3. The original launch time is this Friday (in 2 days).
4. The current budget has overspent by 5%.
5. The development team has worked overtime for two consecutive weeks; morale is very poor.
6. The marketing department's teaser posters have already been sent out.
Step 2: Classify and Group (Find Logic)
- Progress/Tech Group: Payment Bug is severe, repair takes 3 days, exceeding original launch time.
- Resource/Team Group: Budget overspent, team exhausted.
- External Impact Group: Marketing has promoted, delay carries PR risks.
Step 3: Distill Viewpoints (So What?)
- Technical Level: Cannot launch on time; forced launch will cause serious transaction accidents.
- Team Level: Existing resources cannot solve the problem by "throwing bodies at it" because people are already showing fatigue and budget is insufficient.
- Risk Level: Need to coordinate with the marketing department to control the negative impact of the delay.
Step 4: Summarize Core Conclusion (Final Report Script)
Combine the above viewpoints into an action directive, not a description of phenomena.
❌ Failed Report (Listing Style):
"Boss, we have a Bug we can't finish fixing, the budget is over, everyone is tired, and it looks like Friday launch is a no-go..."
(Boss's Inner Monologue: So what? What do you want me to do? Fix the Bug for you?)
✅ Successful Report (Conclusion First):
"Boss, I suggest postponing the project launch time by one week (Conclusion).
Based mainly on three considerations: First, a blocking Bug was found in the payment interface, and a forced launch will lead to transaction failures (Technical Risk); Second, the team is currently in a fatigue period and over budget, making it impossible to solve the problem through short-term crunching (Resource Constraints); Third, we need this week to coordinate with the marketing department to adjust the promotion rhythm (Risk Control)."
Through this "addition first, then subtraction" thinking process, the originally messy bad news turns into a "well-considered decision recommendation." The probability of the boss interrupting you will be drastically reduced because you have already completed the most brain-draining information processing work for him.
Step 2: Build the Pyramid Structure (Arguments Support the Conclusion)
After you have extracted the core conclusion through the "inductive method" in the first step, the next step is to use the "deductive method" or "inductive grouping" to build the logical framework supporting the conclusion. The core of this step lies in: Do not dump all details on the boss at once, but categorize the arguments and arrange them according to a specific logic.
A solid pyramid structure must follow the principle of "top-down governance"—the points at each level must be a summary of the information at the level below, while the level below serves as an explanation and support for the level above. To make your report impeccable, you need to master three standard logical ordering methods and use the MECE principle for self-inspection.
1. Three Standard Logical Orders (Grouping Logics)
According to the core principles of the Pyramid Principle, the arguments supporting the conclusion can usually be arranged according to the following three logics, and you need to choose the most suitable one based on the specific content of the report:
- Time Sequence: Suitable for reporting project progress, process planning, or event reviews.
- Example: "To achieve the goal, we will execute in three stages: Phase 1 completes core function development, Phase 2 conducts internal testing, and Phase 3 goes fully live."
- Structural Order: Suitable for reports involving different departments, geographical regions, or physical components.
- Example: "The budget overrun mainly occurred in three departments: R&D (server expansion), Marketing (channel price increases), and Administration (relocation costs)."
- Importance Order: Suitable for making suggestions or analyzing causes, prioritizing the factors that have the greatest impact on decision-making.
- Example: "There are three reasons to suggest pausing this project, listed by importance: First is the risk of capital chain rupture, second is the technical barriers not yet broken, and finally, low team morale."
2. Quality Check: MECE Principle
After building the argument groups, you must use the MECE Principle (Mutually Exclusive, Collectively Exhaustive) to conduct a "bulletproof test." This is the most commonly used thinking tool for consultants and senior managers, meaning "Mutually Exclusive, Collectively Exhaustive."
- Mutually Exclusive: Confirm that there is no overlap between your arguments.
- Bad Example: "Reasons include: 1. Sales decline; 2. Decrease in customer purchases." (These two points are actually saying the same thing, which will make the boss feel your logic is confused).
- Collectively Exhaustive: Confirm that there are no obvious omissions in your arguments.
- Risk Point: If you list the market conditions for "East China" and "South China" but miss "North China," the boss will immediately challenge your conclusion: "What about the situation in North China? Did you deliberately omit it because the North China data is good?"
3. Practical Template: Standard Reporting Script
When the conclusion is clear, the logic is smooth, and the MECE check is passed, you can directly apply the following script for reporting. This structure forces you to maintain "conclusion first" and gives the audience clear expectation management:
"Boss, regarding [Project/Issue], my suggestion/conclusion is [Core Conclusion X].
It is mainly based on the following three reasons/considerations:
1. [Most Critical Argument A]: The specific data is...
2. [Next Critical Argument B]: The current situation is...
3. [Supporting Argument C]: The supplementary impact of this point is...
Based on the above points, we can proceed to the next step of discussion."
This structure not only demonstrates your professionalism but, more importantly, saves the boss mental energy. He does not need to piece together logic from fragmented information himself, thereby greatly reducing the probability of being "interrupted."
Scenario-based Scripts: "Conclusion First" Templates for Different Situations
Even if we understand the core logic of the Pyramid Principle, in high-pressure environments (such as meeting the boss in an elevator or being suddenly questioned in a high-level meeting), we often instinctively retreat to a linear narrative mode of "telling a story."
To break this inertia, the most direct method is to build "muscle memory." Below are "Before vs. After" script comparison tables for three high-frequency workplace scenarios, which you can apply directly as templates. The core of these templates lies in: restraining the impulse for "buildup" and forcing yourself to deliver value in the very first sentence.
Scenario 1: Project Status Update
This is the scenario most likely to turn into a "laundry list." Most people habitually list "what was done" (Activity) in chronological order, while managers actually care about "result status" (Status) and "potential risks" (Risk).
Dimension | ❌ Wrong Example (Process-oriented) | ✅ Correct Template (Conclusion First + Risk Front-loaded) |
|---|---|---|
Mindset | "I was very busy this week and did a lot of things." | "Is the project under control? What are the key outputs?" |
Script Instance | "Boss, we followed up on a lot of things this week. First, we fixed the Bug in Module A, then aligned the UI with the design department. Although there were some disagreements, they were resolved. Also, we ran the backend data once..."<br><br>(Problem: After listening for a long time, it's unclear if the project can launch on time) | "Currently, the project is [On Track/Delayed].<br>The core milestone this week was completing the acceptance of Module A. The only risk point is the payment interface debugging, which is expected to be delayed by 1 day, but we have arranged for weekend testing, so it will not affect the final launch time." |
💡 Expert Tip: If it is bad news (such as a delay), it is even more important to put the conclusion first. Refer to Gank Interview's advice and adopt the structure of "Risk + Attempts Made + Support Needed," which is much more professional than simply covering up problems or letting them "blow up" at the end.
Scenario 2: Requesting Resources
When you need to increase headcount or budget, avoid starting with complaints about "hard work." The boss's decision-making logic is ROI (Return on Investment), not sympathy. You need to transform "difficulties" into "conditions required to achieve goals."
Dimension | ❌ Wrong Example (Emotion-oriented) | ✅ Correct Template (Goal-oriented) |
|---|---|---|
Mindset | "We are too tired and can't go on." | "To secure performance, what do we need to configure?" |
Script Instance | "The team has been working overtime every day recently, and everyone can't take it anymore. Requirements keep coming endlessly. If we don't hire people, we really can't finish, and the quality will drop too..."<br><br>(Problem: Sounds like whining, lacks business persuasion) | "To ensure the achievement of Q4 performance goals, we need to add 1 Senior Backend Engineer headcount.<br>The current manpower gap causes the launch of core features to potentially be delayed by 2 weeks. If we can start recruiting this week, we are confident in completing all feature deliveries before Double 11." |
💡 Structure Breakdown:
- Conclusion (Request): We need X resources.
- Reason (Benefit/Consequence): If not added, it affects Q4 goals; if added, it ensures Y results.
- Support (Data): Specific comparison of current manpower gap vs. task volume.
Scenario 3: Answering Questions
When asked "Why have sales declined?" or "Why choose this plan?", the biggest taboo is listing details in a "making excuses" manner. At this time, the PREP structure (Point - Reason - Example - Point) should be used.
- ❌ Wrong Example (Excuse-making style):
> "Oh, mainly the general environment is bad recently, and the competitor ran a big promotion, and our budget hasn't been approved yet, plus a few people from the sales team left..."
> (Boss's inner monologue: So what is the core reason? Is it all objective reasons?) - ✅ Correct Template (Categorization style):
> "The decline in sales is mainly caused by two reasons: the core reason is seasonal fluctuation, and the secondary reason is the impact of competitor promotions.
> First, historical data shows that Q3 is usually the off-season (data support);
> Second, the competitor initiated a price war last week, diverting about 15% of traffic (external factor).
> Regarding these two points, we have formulated the following response plans..."
By using this "Generalize first, elaborate later" approach, you not only answer the question but also demonstrate your sense of control over the business and logical analysis ability, which is the key to building trust in daily communication via the Pyramid Principle.
Advanced Technique: Should You Put the Conclusion First Even for "Bad News"?
Many people instinctively violate the Pyramid Principle when reporting "bad news" (such as project delays, customer churn, or budget overruns). Out of fear or self-protection, we tend to make long preambles: emphasizing how hostile the environment is, how hard the team worked, and how tortuous the process was, attempting to gain some sympathy points before dropping the terrible result.
However, this practice of "hiding bad news at the end" is often a major taboo in workplace communication, known as a "Surprise Bomb."
Redefining the Conclusion of "Bad News"
What bosses dislike most is not the problem itself, but "finding out at the last minute" and "you only brought the problem, not the solution."
When reporting bad news, adhering to "conclusion first" does not mean you have to bluntly rush into the office shouting "the project is screwed." You need to redefine what a "conclusion" is. For bad news, Conclusion The Painful Failure Result, Conclusion Status Assessment Solution (or Remedial Plan).
This approach can instantly shift the focus of the conversation from "assigning blame" to "solving the problem," demonstrating your control over risks.
Comparison Case:
- ❌ Incorrect Reporting (Cover-up/Preamble Style):
> "Boss, the market environment has been really tough recently, competitors are making big moves, and although our team has been working overtime, the client's budget approval is very strict, plus the sales rep following up before resigned..."
> (Boss's inner monologue: What exactly are you trying to say? Did we lose the deal? Stop making excuses!)
> "...So, unfortunately, Client X ultimately did not choose us." - ✅ Correct Reporting (Conclusion First - Risk + Solution):
> "Boss, Client X currently has a very high risk of churn, but I have developed a recovery plan and need your approval for two key resources."
> (Boss's inner monologue: Although there is a risk, he already has a countermeasure. Let's hear how to save it.)
Using the PREP Model to Soften the Blow
To maintain the efficiency of "conclusion first" when delivering bad news without appearing reckless, you can use the PREP Model to build your pyramid structure. This structure makes your negative information appear logically tight and objective, rather than an emotional vent.
- P (Point) Conclusion/Viewpoint: Directly state the core impact of the bad news and your coping strategy.
- Script example: "Currently, the main structure progress is lagging by two days, but I have arranged to catch up next week by adjusting the process."
- R (Reason) Reason: Briefly explain the root cause leading to this situation (not an excuse, but objective attribution).
- Script example: "The reason is that recent heavy rains made outdoor concrete pouring impossible."
- E (Example/Evidence) Example/Data: Provide data or facts to support that your judgment and plan are feasible.
- Script example: "Based on past experience with construction during the rainy season, we have activated the indoor prefabrication plan. Although costs will increase slightly, it ensures the total schedule remains unaffected."
- P (Point) Reiterate Conclusion/Request: Return to the solution again, clarifying the next steps or support needed.
- Script example: "Therefore, I suggest maintaining the current rush schedule and ask for your approval to activate the backup crew."
As pointed out by industry experience, in high-risk industries such as engineering or project management, bad news must be told first. If you reveal the risk along with a solution right at the start, the other party will think you are proactively taking charge; if you drag it out until the end, they will only feel you are concealing information.
Remember: "Conclusion first" does not mean "No Context"; it means using context as a pillar to support the conclusion, rather than a fog to mask it. Do not try to use preambles to soften the blow; use clear remedial plans to build trust.
PPT and Written Reporting: The Visual "Pyramid"

Many people mistakenly believe that the "Pyramid Principle" is merely a logic for speaking, but its power is even greater in visual media like PPTs and emails. When facing a screen, the patience of listeners or readers is usually lower than in face-to-face communication. If the conclusion is not visible at first glance in your slides or emails, the other party's attention will be lost within the first 3 seconds.
To implement "conclusion first" in written and visual reporting, you need to break the traditional narrative habit of "introduction, development, transition, and conclusion," and turn the page layout itself into a pyramid.
PPT: Turning "Titles" into "Conclusions"
When creating a PPT, the most common mistake is using "noun-based titles." For example, when reporting sales data, many people's title is "2023 Sales Data Analysis." This is just a directory classification, not a viewpoint. After seeing this title, the audience still needs to spend energy interpreting the complex charts below to draw a conclusion.
Top consulting firms (such as McKinsey) require the use of "Action Titles." The title of each PPT page should not be a noun phrase, but a complete sentence that directly summarizes the core argument of that page.
Comparison Case:
- ❌ Ineffective Title (Classification only): "User Growth Data Overview"
- ✅ Pyramid Title (Conclusion first): "Due to the effectiveness of new channel placement, Q3 user growth rate increased by 25% quarter-over-quarter"
Page Layout Suggestions:
- Tip (Header): The title bar at the top of the page is the conclusion of this page. The audience should be able to understand all the information the page intends to convey just by reading the title.
- Body: The main body of the page is no longer a pile of text, but evidence used to support the title. It usually adopts a "three-column" layout, displaying data charts, customer testimonials, or execution steps respectively, strictly following the principle of "summary governing details."
- Navigation (Tracker): Like McKinsey presentation examples, use the navigation bar at the edge of the page to show logical progress, letting the audience know at all times which branch of the pyramid they are currently in.
Email Reporting: Rejecting "Mystery Novel" Style Subject Lines
In workplace emails, the Pyramid Principle is mainly reflected in the Subject Line and the First Paragraph.
Many people's email habits are like writing mystery novels. The subject says "Report on Project Progress," and after clicking in, the first paragraph exchanges pleasantries, the second talks about the background, the third talks about the process, and finally, at the end, they shyly mention: "So we need to apply for a budget increase."
This communication style is disastrous in the era of mobile office work. Executives process hundreds of emails a day; they may only preview the first two lines through the notification bar.
Efficient Email Template:
- Subject Line (Billboard): Treat it as a billboard beside a highway, directly displaying the core intent rather than just describing the content scope.
- ❌ Weak Subject: "Update regarding next week's meeting"
- ✅ Strong Subject: "[Decision Required] Budget Approval Request for Next Week's Project Kickoff (Proposal Attached)"
- First Paragraph (The Ask/The Point): The first paragraph of the email body must contain the conclusion or request (Call to Action). Do not pave the way with background; state the result directly.
- Example: "Mr. Li, reporting this week's progress: The project is 80% complete according to plan, but due to supplier material delays, there is a risk of a 3-day delay. It is recommended to activate the backup Supplier B plan; please approve."
- Subsequent Paragraphs (Details): After the conclusion, use Pyramid structure subheadings (such as "Background Reasons," "Comparison of Alternatives," "Risk Assessment") to expand on details. In this way, if the leader trusts your conclusion, they don't need to read the full text in detail; if they need to review details, they can also quickly locate them through the structure.
Whether it is PPT or email, the visual "pyramid" is essentially a transfer of reading costs—as the reporter, you spend energy refining the structure so that the receiver can obtain information with zero friction. This is not only a logic issue but also a reflection of professionalism.